Schedule is subject to change due to unforeseen circumstances. Please check back for any updates.
June: 02 (0700) Power will be rerouted in (1) rack in the Case-Geyer Data Center to create space for additional HPC power requirements. There is no 鈥渆xpected鈥 downtime due to dual power redundancy on all the affected servers.
June: 02 (0800) James C 大发彩票 will experience partial building network disruption for 15 minutes as a new switch is added to the 1st floor stack due to reached capacity. This will affect wireless and wired connectivity during this time for part of the building.
June: 03 (0800) The replacement of the ClearPass certificate will potentially create a prompt for devices while connecting to EDUROAM. In the case a prompt appears, verify that it is from InCommon, accept the certificate and the device will be able to connect to EDUROAM
June: 04 (0800) Shutdown of O鈥機onnor ESXI hosts to test VM redundancy/capacity post memory upgrade. No impact 鈥渟hould鈥 be noticed.
June: 05 (0700) OneCard software upgrade: system will be taken offline to allow software updates to occur. Gate card usage at vendors and Frank may not succeed during the downtime window which is expected to last 60 minutes but may last 120 minutes.
June: 05 (0800) Bulk Clearpass service changes to go into effect: re-adding previously removed buildings from the wired guest network service due to technical issues. Removing legacy policies related to retired equipment that is no longer in use.
June: 06 (0600) Bookstore鈥檚 backup wireless point to point bridge will be re-enabled and re-tested in preparation for upcoming fiber work at 70 Broad St later in the month.
June: 09-17 (0400-0800) Network Switch Upgrades to take place. Interruptions to wired, wireless, phone and server connectivity intermittently during this time. Typical interruptions should be no more than 15 minutes per location.
09: Building, Classroom and 12 Port
10: Data Center 鈥渞ow鈥 Switches
11: Data Center (8320/8325) Switches
12: Make Up Day
16: Core Switches
17: Campus Safety (0700)
June: 18-19th The fiber junction box in front of 70 Broad St will be relocated closer to the street to make room for the demo/construction of the new 70 Broad St. This will interrupt network connectivity downtown (10 Utica, 13 Payne, Bookstore and 8 Lebanon) while fiber splicing occurs. *Bookstore will run on a temporary point-to-point wireless bridge.